Examlex

Solved

Production Time Is Monday to Friday 8:00 to 18:00

question 145

Multiple Choice

Production time is Monday to Friday 8:00 to 18:00.  There are three LUNs, respectively LUN1, LUN2, LUN3, LUN1 with a size of 500G, all IO. The average response time needs to be within 5ms, the size of LUN2 is 4TB, the coexistence of hot and cold data (with 12.5% of the hot data) , and the size of LUN3 is 10TB. If performance requirements are not high and the engineer plans to use SmartTier, which of the following description is correct? (Multiple choice)


Definitions:

User Defined Input

A setting or value entered into a system by the user to customize operations or outcomes.

Pre-determined Speed

The speed set for a machine or device, decided before it is operated.

Rated Speed

Rated speed is the speed at which an electric motor or machine is designed to operate under a specific load to achieve optimum performance.

VFD Technology

Variable Frequency Drive technology, enabling control of the speed and torque of electric motors by varying the input frequency and voltage.

Related Questions