A project manager has been asked to prepare and present a review of the execution phase. Which of the following is the BEST audience for this review?


Definitions:

Confidence Interval Estimate

An estimated range of values calculated to determine the confidence level for the parameter being measured in a population.

Prediction Interval

A calculated range predicting where future measurements are expected to lie, considering previous data, and accompanied by a designated probability.

Spearman Rank Correlation Coefficient

A rank correlation metric that does not rely on parametric assumptions to evaluate how effectively a monotonic function describes the connection between two variables.

Ordinal Variables

A type of variable where the order of the values is significant, but the differences between the values are not necessarily consistent.