Assume there are five jobs (i.e., A, B, C, D, and E) that need to be sequenced in a production schedule.The remaining operating time necessary for completion of job A is 4 days (i.e., job A will take 4 more days to complete) , B will take 7 days, C will take 8 days, D will take 2 days, and E will take 5 days.All jobs are available now and the time now is 0.Using SOT rule sequence the jobs and find the schedule (single machine scheduling problem) .What is the completion time of job B as per your schedule?
Homeostasis
The self-regulating process by which biological systems maintain stability while adjusting to changing external conditions.
Neuropeptides
Small protein-like molecules used by neurons to communicate with each other, often playing a role in pain, reward, food intake, learning, and memory.
Aspirin
A medication used to reduce pain, fever, inflammation, and, in low doses, to prevent blood clots.
Coagulation
The process by which blood changes from a liquid to a gel, forming a clot, notably significant in stopping bleeding and initiating wound healing.
Q5: Instructions: Identify the following term(s).<br>the Austrian Habsburgs
Q7: Edward Deming and Philip Crosby were pioneers
Q10: Instructions: Identify the following term(s).<br>Vasco da Gama
Q10: The FCFS priority rule used in sequencing
Q20: Which of the following is a negative
Q39: According to the theory of constraints, it
Q41: One of the objectives of facility location
Q50: The flow of work through a hospital
Q54: A process batch should be no larger
Q101: Prince Henry<br>A)was the first European to get