You have been asked to balance a flow shop assembly operation to achieve an output rate of 80 units per eight-hour day. Task times and precedence relationships are shown in the table below.
a. Draw the precedence diagram.
b. Determine the desired cycle time.
c. Determine the theoretical minimum number of stations needed.
d. Balance this line using most following tasks.
e. What is the efficiency of the line obtained in part d?
Auto Correct
A software feature that automatically corrects spelling or grammatical errors as the user types.
Common Errors
Typical mistakes or inaccuracies that occur frequently in a particular context.
Collaborative Writing Tool
A software or online platform that enables multiple users to work on the same document simultaneously, facilitating teamwork and efficiency.
Microsoft Groove
A collaborative software application by Microsoft, designed for document and file sharing within a team environment.
Q19: Of all areas of the organization, why
Q37: Lag and straddle strategies for increasing capacity
Q43: Maintaining a stable workforce generally results in
Q61: Which of the following is not one
Q62: Work sampling estimates the percent of time
Q65: Which one of the following statements about
Q70: Why do modern operations managers look for
Q71: A firm is evaluating country risk
Q81: A Methods and Measurements Analyst needs
Q138: All of the following statements about ABC