A Methods and Measurements Analyst needs to develop a time standard for a certain task. The task involves use of ruler, square, and portable electric saw to mark and cut the "notch" in a rafter (a standard carpentry task of home construction). In a preliminary study, he observed one of his workers perform this task five times. The observations were made in an air-conditioned, well-lighted training facility, at ground level, with all tools and equipment clean and readily available.
a. What is the actual average time for this task?
b. What is the normal time for this task if the employee worked at a 20% faster pace than is typical for adequately trained workers?
c. What is standard time for this task if allowances are 8% constant and 6% variable?
d. If the analyst then thought more carefully about his experiment, and decided that the variable allowances needed to be increased to match the real (outside, unair-conditioned) work environment, and that the proper variable allowance was not 6% but 12%, what is the revised standard time?
Cost Drivers
Factors that cause a change in the cost of an activity, such as machine-hours or labor hours, influencing direct and indirect costs.
Guests
Individuals invited to partake or be present in an event, establishment, or locale.
Jeeps
A brand known for manufacturing rugged off-road and sports utility vehicles.
Patient-visits
A measure used in healthcare settings, representing the number of encounters between patients and healthcare providers.
Q1: A(n) _ line is a machine-paced product-oriented
Q3: Keyboard design, noisy work environment, and dangerous
Q9: An enlarged job has more responsibility than
Q11: Which of the following was not a
Q28: Daily demand for a product is normally
Q81: The owner of a millwork shop
Q108: Manufacturers may want to locate close to
Q125: When is a good time for cycle-counting
Q126: Which of the following is <b>true </b>regarding
Q135: The major problem addressed by the warehouse