question 67

Essay

Complete the table, find average lateness, find average completion time, and average number of jobs in the system. Assume all durations are in days and that the jobs are processed at the shop in the order that they arrive (A then B then C then D).
 Tob  Process Time  Flow Time  Due Date  Lateness  A 5B39C212D54 Sum 15(3.75) Average) 15(3.75)XXXX\begin{array}{|l|l|l|l|l|}\hline \text { Tob } & \text { Process Time } & \text { Flow Time } & \text { Due Date } & \text { Lateness } \\\hline \text { A } & 5 & & & \\\hline \mathrm{B} & 3 && 9 \\\hline \mathrm{C} & 2 && 12 \\\hline \mathrm{D} & 5 && 4 \\\hline \text { Sum } & 15(3.75) & \\\hline \text { Average) } & 15(3.75)&& \mathrm{XXXX} \\\hline\end{array}


Definitions:

Limestone Caves

Natural cavities formed within limestone rock due to the dissolution of carbonate minerals by water, known for their unique formations and speleothems.

Quartz Crystals

Hard, crystalline minerals made of silica (SiO2), used in various applications due to their piezoelectric properties.

Sinkholes

Depressions or holes in the ground caused by the collapse of a surface layer, occurring in areas where the rock below is limestone, carbonate rock, salt beds, or other rocks that can be dissolved by groundwater.

Sinkhole

A natural depression formation caused by the dissolution of soluble bedrock or substrate collapse.

Related Questions