Cost curves shift if
i.technology changes.
ii.the prices of factors of production change.
iii.productivity changes.


Definitions:

Finite Capacity Scheduling

A method of production scheduling that takes into account the finite resources available, such as machinery and labor, to optimize the production plan.

MRP

Stands for Materials Requirement Planning, a system used to manage manufacturing processes by calculating materials, components, and schedule needed for production.

MRP

Material Requirements Planning is a method used to determine the materials and parts required for product production.