Examlex
Auditors begin their assessments of inherent risk during audit planning. Which of the following would not help in assessing inherent risk during the planning phase?
Variable Overhead Rate Variance
The difference between the actual variable overhead incurred and the expected variable overhead based on the predetermined rate.
Direct Materials
Raw materials that are directly traceable to the manufacturing of a specific product and included in the direct costs of production.
Variable Overhead
Costs that vary with the level of production or business activity, such as utilities or indirect materials.
Direct Material
Raw materials and components that are directly incorporated into a finished product and can be easily traced to the product.
Q18: Which of the following is not a
Q40: Auditor's allocate the preliminary judgment about materiality
Q56: The _ is helpful in preventing classification
Q60: Inspection consists of looking at a process
Q62: A canceled check written by the client,made
Q71: If acceptable audit risk is low,and inherent
Q77: If the audit assurance rate is 95%,then
Q85: Which of the following is a correct
Q111: Auditors use evidence to help them draw
Q123: If there is collusion among management,the chance