XY22041661288\begin{array}{cr}X & Y \\\hline 2 & 20 \\4 & 16 \\6 & 12 \\8 & 8\end{array}

question 176

Essay

XY22041661288\begin{array}{cr}X & Y \\\hline 2 & 20 \\4 & 16 \\6 & 12 \\8 & 8\end{array}
-Graph the data in the table above in the figure.Label the axes.
\begin{array}{cr} X & Y \\ \hline 2 & 20 \\ 4 & 16 \\ 6 & 12 \\ 8 & 8 \end{array}  -Graph the data in the table above in the figure.Label the axes.     a. Is the relationship between X and Y positive or negative? b. What is the slope when X = 4? c. What is the slope when X = 8?
a. Is the relationship between X and Y positive or negative?
b. What is the slope when X = 4?
c. What is the slope when X = 8?


Definitions:

Predetermined Overhead Rate

A rate calculated before the period begins, used to allocate manufacturing overhead costs to individual units of production based on a chosen activity basis, such as labor hours or machine hours.

Direct Labor-hour

A metric indicating the man-hours spent on direct labor to produce goods, crucial for calculating production costs and pricing strategies.

Predetermined Manufacturing Overhead

The estimated overhead rate used to allocate manufacturing overhead costs to products or services based on activity levels.

Job M

A specific production or project operation identified by a unique job number for costing purposes.