Examlex
Figure 1.2
Using the figure above, identify the labeled part.
-Label J: ______________________________
Overhead Applied
The process of assigning or allocating overhead costs to products or cost objects based on a predetermined overhead rate.
Job M825
A specific identifier for a job order, project, or batch within a job-order costing system, used to accumulate and track costs associated with that job.
Overhead Applied
The portion of overhead costs allocated to individual units of production.
Total Job Cost
The sum of all costs assigned to a specific job or project, including materials, labor, and overhead.