Material requirements planning (MRP) programs use___________ to put long-lead material on order.
Production Date
The date on which a product was manufactured or assembled.
Week Number
A numerical representation of the sequential order of weeks in a calendar year, used for planning and scheduling.
Treadwear Number
A numerical rating that indicates the relative durability of a tire's tread, reflecting its expected longevity.
Rim Bead
The edge of a tire that sits tightly against the wheel rim, ensuring an airtight seal.