The process design team at a manufacturer has broken an assembly process into eight basic steps, each with a required time, and predecessor as shown in the table. There are 7.5 productive hours available in a day and the manufacturer wishes to produce 400 units. Balance the line by assigning tasks to workstations to fill up as much takt time as possible. Break ties by assigning the longest task first.
-Refer to the scenario above. What task(s) should be assigned at the third workstation?
Boredom
A state of feeling disinterested in one's surroundings, activities, or responsibilities.
Communicator
An individual or entity that conveys information or messages to others through various mediums.
Message
A piece of information or communication sent from one individual or group to another.
Context
The circumstances or setting surrounding an event, statement, or idea which gives it additional meaning.
Q4: The _ includes all the value-added physical
Q8: _ is a measure of process performance
Q8: This transportation mode is often the most
Q17: Customers that leave the system after waiting
Q19: Multiple regression was used to forecast success
Q46: As long as each functional area in
Q57: Dusty is evaluating two bids to supply
Q66: This table contains the performance criteria and
Q145: The "Big Mac Theory of Exchange Rates"
Q216: What do reports that the dollar is