The correct opportunity cost for a project is determined to be 15% and the project is expected to generate $1 million in cash flows at the end of the next four years after an initial outlay of $3 million.Based on this information, the project would plot:


Definitions:

Independent Variable

The factor in an experiment that is intentionally altered to determine its impact on the outcome variable.

Dependent Variable

The variable in an experiment that is expected to change in response to manipulations in the independent variable.

Extraneous Variable

A variable that is not of interest in a study but can affect the outcome of the experiment, potentially leading to erroneous conclusions if not controlled.

Control Factors

Variables that are kept constant and unchanging throughout an experiment to ensure that the results are due to the independent variable being tested.