A Project Is Represented by the Activity Durations (Estimated at 90

question 59

Multiple Choice

A project is represented by the activity durations (estimated at 90% likelihood of completion) and precedence requirements shown in the table.What is the overall duration of this project if it is managed using critical chain methodology?  Activity  Predecessor  Ieength  Activity  Predecesser  Ieength  A 20DB16B A 20EC8C A 10 FD,E8\begin{array} { | l | l | l | l | l | l | } \hline \text { Activity } & \text { Predecessor } & \text { Ieength } & \text { Activity } & \text { Predecesser } & \text { Ieength } \\\hline \text { A } & - - & 20 & \mathrm { D } & \mathrm { B } & 16 \\\hline \mathrm { B } & \text { A } & 20 & \mathrm { E } & \mathrm { C } & 8 \\\hline \mathrm { C } & \text { A } & 10 & \mathrm {~F} & \mathrm { D } , \mathrm { E } & 8 \\\hline\end{array}


Definitions:

Semi-Permanent

Describes something not intended to last forever but not as temporary as frequently replaced items, indicating a medium duration of usability.

Loop

A structure, series, or process the end of which is connected to the beginning.

Axial Loading

Load applied along or parallel to the main axis of an object, typically leading to compressive or tensile stress.

Centrifugal Loading

The force exerted outward on a body moving in a circular path around a central point.

Related Questions