Use the Information in the Table Regarding This Seven-Month Project

question 81

Essay

Use the information in the table regarding this seven-month project to calculate the SPI in terms of dollars and compare it with the SPI calculated in terms of time.Perform both calculations for months 1 through 6.Then use the SPI(t)to provide the Estimate at Completion for Time (EACt).
 Month 1 Month 2 Month 3 Month 4  Month 5 Month 6  Month 7 PV ($) $125$275$500$875$1,485$2,325$2,670 EV ($) $150$320$510$850$1425$2280$0\begin{array} { | l | l | l | l | l | l | l | l | } \hline & \text { Month } 1 & \text { Month } 2 & \text { Month } 3 & \text { Month 4 } & \text { Month } 5 & \text { Month 6 } & \text { Month } 7 \\\hline \text { PV (\$) } & \$ 125 & \$ 275 & \$ 500 & \$ 875 & \$ 1,485 & \$ 2,325 & \$ 2,670 \\\hline \text { EV (\$) } & \$ 150 & \$ 320 & \$ 510 & \$ 850 & \$ 1425 & \$ 2280 & \$ 0 \\\hline\end{array}


Definitions:

Yellow SRS Connector

A specific color-coded connector used in vehicle Supplemental Restraint Systems (SRS), such as airbag systems, for diagnostics and repairs.

Hybrid Vehicles

Automobiles powered by a combination of internal combustion engines and electric motors, using energy stored in batteries, aiming for increased fuel efficiency and reduced emissions.

High-Voltage System

Electrical systems operating at voltages higher than standard, often found in electric and hybrid vehicles, requiring special safety precautions.

Red Wiring

Electrical wiring that is color-coded red, often indicating a positive power connection in a circuit.

Related Questions