In a Work Center, Machine a Has a 10-Minute Set-Up

question 29

Multiple Choice

In a work center, machine A has a 10-minute set-up time per batch and a 2-minute per unit run time.Machine B performs the identical function but has a set-up time of 30 minutes and a 1-minute run time per unit.The work center makes products in batches ranging from 1 unit to 100 units.Assuming capacity is not a limitation on either machine, in order to minimize the total processing time, on which batches should machine B be used?


Definitions:

Apical Rate

The heart rate as measured at the apex of the heart, which provides a more accurate assessment of heart beats per minute.

Blood Pressure

The force exerted by circulating blood upon the walls of blood vessels, measured in systolic (maximum) and diastolic (minimum) pressures.

Hyperthermia Blanket

A medical device used to increase the body temperature of a patient, often used in hypothermia treatment or to maintain body temperature during surgery.

Traumatic Head Injury

Injury to the head arising from blunt or penetrating trauma, which can lead to various degrees of brain damage and impairment.

Related Questions