Examlex
The process within TB Figure 15.3, Bubble 3.0 might be described as follows: After the master production schedule is determined, an important step in completing the production in a timely manner is identifying, ordering, and receiving materials. Materials requirements planning is a process that uses bills of material, raw material and WIP inventory status data, open order data, and the master production schedule to calculate a time-phased order requirements schedule for materials and subassemblies. The schedule shows the time period when a manufacturing order or purchase order should be released so that the subassemblies and raw materials will be available when needed. The process involves working backward from the date production is to begin to determine the timing for manufacturing subassemblies and then moving back further to determine the date that orders for materials must be issued into the purchasing process. In an enterprise system, this process is performed automatically, using a variety of data from the enterprise database including:
*Bills of materials, showing the items and quantites required as developed by engineerng.
*Parts master data, which contains infarmation about part number, description, unit of measure, where used, arder policy. lead tine, and safety stack.
*Raw materials and WIP inventory status data showing the current quantities an hand and quantities already reserved for production for the materials and subassemblies.
*Open purchase order data showring the existing arders for materials. The process begins by exploding the bill of materials to determine the total of each component required to manufacture a given quantity of an upper level assembly or a subassembly specified in the master production schedule. Based on lead time data for producing and ordering materials and subassembly requirements are output in a time-phased order requirements schedule. Based on this schedule, and open PO data, purchase requisitions are generated and sent to purchasing.
Required:
Refer to TB Figure 15.3. Prepare a Level 1 data flow diagram for the materials requirements planning process only.
Animal Hair
The filamentous biomaterial that grows from the skin of animals, primarily used for protection, sensory purposes, and heat regulation.
Alpha Helices
A common structural motif in proteins, characterized by a right-handed helix with amino acid residues arranged in a coiled manner.
Pleated Sheets
Pleated sheets are a form of secondary structure found in proteins, characterized by folding of the peptide chain into a series of pleats, primarily stabilized by hydrogen bonds.
Induced Dipole Bonding
A type of weak intermolecular force that arises when the presence of a polar molecule induces a dipole in a nonpolar molecule.
Q7: The logical specification, physical requirements, and budget
Q30: The financial reporting officer is responsible for
Q32: A(n) _ is an automated manufacturing operations
Q34: Wound healing can be slowed by the
Q44: Which of the following items is not
Q50: Making repairs and modifications to the system
Q52: In selecting a vendor, a buyer may
Q100: Which of the following is a characteristic
Q112: Which of the following has the inputs
Q134: Assume that one of the process bubbles