In Setting Up a Kanban Control System You Need to Determine

question 62

Multiple Choice

In setting up a kanban control system you need to determine the number of kanban card sets needed. If the expected demand during lead time is 25 per hour, the safety stock is 20 percent of the demand during lead time, the container size is 5, and the lead time to replenish an order is 5 hours, what the number of kanban card sets is needed?


Definitions:

Good Integration

The successful combination or assimilation of different parts or elements, such as integrating aspects of personality in therapy.

Structuralism/poststructuralism

A philosophical approach emphasizing the understanding of cultural and social phenomena in terms of underlying structures (structuralism) and their inherent instability and openness to interpretation (poststructuralism).

Constructivism

A philosophical viewpoint suggesting that humans construct meaning rather than discovering a pre-existing truth.

Social-constructivism

A theory that suggests knowledge is constructed through social interactions and cultural norms, emphasizing the importance of social context in understanding reality.

Related Questions