Examlex

Solved

Kostelnik Corporation Uses a Job-Order Costing System with a Single

question 43

Multiple Choice

Kostelnik Corporation uses a job-order costing system with a single plantwide predetermined overhead rate based on machine-hours. The company based its predetermined overhead rate for the current year on total fixed manufacturing overhead cost of $237,000, variable manufacturing overhead of $3.90 per machine-hour, and 30,000 machine-hours. The company has provided the following data concerning Job A496 which was recently completed:
Kostelnik Corporation uses a job-order costing system with a single plantwide predetermined overhead rate based on machine-hours. The company based its predetermined overhead rate for the current year on total fixed manufacturing overhead cost of $237,000, variable manufacturing overhead of $3.90 per machine-hour, and 30,000 machine-hours. The company has provided the following data concerning Job A496 which was recently completed:    -The total job cost for Job A496 is closest to: A)  $2,660 B)  $3,104 C)  $3,604 D)  $1,444
-The total job cost for Job A496 is closest to:


Definitions:

Resolution

The smallest distinguishable increment into which a quantity is divided.

Input impedance

The impedance presented by an electrical device or circuit at its input, affecting how it interacts with the signal sources connected to it.

Ladder Logic

A programming language used in programmable logic controllers (PLCs) that employs graphical elements resembling a ladder with rungs to represent control logic.

Communication Module

Allows the user to connect the PLC to high-speed local networks that may differ from the network communication provided with the PLC.

Related Questions