When the Control Chart Shows a Change in the Mean

question 44

Multiple Choice

When the When the   control chart shows a change in the mean of the process distribution,the result is referred to as: A) a trend. B) a cycle. C) a level shift. D) instability. control chart shows a change in the mean of the process distribution,the result is referred to as: