Examlex

Solved

Which of the Following Is Not on a Time Ticket

question 134

Multiple Choice

Which of the following is not on a time ticket?


Definitions:

MCR Instruction

Master Control Reset Instruction, used in programming PLCs to control the execution of blocks of logic.

De-energize MCR Coil

The process of removing electrical power from a Master Control Relay (MCR) coil, which stops the current path in the control circuit.

Disconnect Switch

A disconnect switch, also known as an isolator switch, is a device used to ensure that an electrical circuit is completely de-energized for service or maintenance.

JSR Instruction

An assembly language instruction meaning "Jump to SubRoutine," directing the program flow to a specified subroutine.

Related Questions