Examlex

Solved

The Sit-N-Spin Corporation Manufactures and Assembles Office Chairs

question 59

Multiple Choice

The Sit-N-Spin Corporation manufactures and assembles office chairs. Sit-N-Spin uses an activity-based costing system to allocate all manufacturing conversion costs. Each chair consists of 15 separate parts totaling $125 in direct materials, and requires 2.0 hours of machine time to produce. Additional information follows: The Sit-N-Spin Corporation manufactures and assembles office chairs. Sit-N-Spin uses an activity-based costing system to allocate all manufacturing conversion costs. Each chair consists of 15 separate parts totaling $125 in direct materials, and requires 2.0 hours of machine time to produce. Additional information follows:   What is the number of finished office chairs? A) 20 B) 100 C) 250 D) Cannot be determined from the information given What is the number of finished office chairs?


Definitions:

Total Lead Time

The cumulative time required for a product to complete all stages of production, from initiation to final delivery.

Long Setups

The extended time period required to prepare or configure machinery and equipment for a specific production task.

Large Batch Sizes

This term refers to the production of goods in large quantities at a time, often to achieve economies of scale but possibly increasing holding costs.

Smaller Inventories

Holding reduced levels of stocks or goods to lower storage costs and minimize risk of obsolescence.

Related Questions