onfident that the mean amount of time needed to record one additional loan application is somewhere Regression statistics
MultipleR R Square Adjusted R Square Standard Error Observations 0.94470.89240.88860.334230
ANOVA
Regression Residual Total df12829S525.94383.128229.072MS25.94380.1117F232.2200 Significance F4.3946E−15
Intercept Applications Recorded Coefficients 0.40240.0126 Standard Error 0.12360.0008 tStat 3.255915.2388 p-value 0.00304.3946E−15 Lower 95% 0.14920.0109 Upper 95% 0.65550.0143
Note: 4.3946E−15 is 4.3946×10−15.

-Referring to Instruction 12.36,you can be 95% confident that the mean amount of time needed to record one additional loan application is somewhere between 0.0109 and 0.0143 hours.
Animation Capabilities
The features or functions available within a software or platform that allow for the creation of moving graphics or animations.
PowerPoint
A Microsoft software program used for creating digital presentations consisting of a series of slides.
Keynote
A main or highlighted address or presentation given at a conference or event, setting the underlying tone or theme.
Linear Flows
Linear flows refer to processes or systems that move in a straight line or sequence, often used in describing workflows or information transfer.