Examlex

Solved

A Platypus Net Is Set Out on Four Successive Days

question 16

Essay

A platypus net is set out on four successive days where a capture-recapture study is located.Only 1 platypus can be netted per day,and the probability that a platypus will enter the trap and be netted is A platypus net is set out on four successive days where a capture-recapture study is located.Only 1 platypus can be netted per day,and the probability that a platypus will enter the trap and be netted is    .If X is the number of platypuses captured over the four days,find the distribution of X.
.If X is the number of platypuses captured over the four days,find the distribution of X.


Definitions:

Overload Protection

A safety feature designed to protect electrical circuits and devices from exceeding their safe current limits.

Contactor Unit

An electrically-controlled switch used for switching an electrical power circuit, commonly used in lighting and electric motor circuits.

Overcurrent

A condition where the current exceeds the rated current of equipment or the capacity of conductors, potentially causing damage or hazard.

Low Intensity

Describes a relatively weak level of power, brightness, or energy output, often used in the context of lights or signals.

Related Questions