Examlex

Solved

A Client Had the Following During a 12-Hour Shift \bullet 15 L of IV Fluid

question 6

Short Answer

A client had the following during a 12-hour shift:
\bullet 1.5 L of IV fluid
\bullet Breakfast 13/41^3 / _4 cup of coffee (cup = 8 oz)
2 oz apple juice
\bullet Lunch 1/2^1 / _2 can ginger ale (1 can = 12 oz)
3 oz jello
\bullet Dinner 2 cups of tea (1 cup = 8 oz)
4 oz gelatin dessert
At the end of the shift, the Foley catheter is emptied of 1,650 mL of urine, and a surgical drain is emptied of 200 mL.
Calculate the I&O for the 12-hour shift in milliliters.
a. Intake ________________ mL;
b. Output _______________ mL


Definitions:

Plant and Equipment

Tangible long-term assets owned by a firm, used in the production or supply of goods and services, such as machinery and buildings.

Functional Currency

The primary currency used by a business or entity in its operations and financial reporting.

Translation Rate

The exchange rate used in translating the financial statements of a foreign entity into the functional currency for reporting purposes.

Functional Currency

The currency of the primary economic environment in which an entity operates, typically used in preparing financial statements.

Related Questions