Individuals were randomly assigned to three different production processes. The hourly units of production for the three processes are shown below.  Individuals were randomly assigned to three different production processes. The hourly units of production for the three processes are shown below.    Use the analysis of variance procedure with  \mu = 0.05 to determine if there is a significant difference in the mean hourly units of production for the three types of production processes.
Use the analysis of variance procedure with μ\mu = 0.05 to determine if there is a significant difference in the mean hourly units of production for the three types of production processes.


Definitions:

Shut-down Point

The level of operations at which a company's revenue is exactly equal to its variable costs, and it is indifferent between continuing operations and shutting down.

Economic Profit

The deviation between complete revenue and cumulative liabilities, including both named and unnamed expenses.

Average Total Cost

The cost per unit of output, calculated by dividing the entire cost of production by the total quantity produced.

Short Run

A period in which at least one input is fixed, limiting the capacity for a firm or economy to adjust to changes in demand or supply.