The manager at a sewing factory uses a piece?rate pay system. She has just received an order for 600 dresses from a discount house downtown. She is trying to figure out what her costs are for the project. She has conducted a time study and found the following times for operations:
2 minutes to sew one sleeve
3 minutes to sew body of the dress
3.5 minutes to hem all unfinished edges
1 minute to attach the collar
3 minutes to attach all buttons
The workers must sit idle while they wait for supplies on the conveyor belt for an average of 30 seconds. Their performance rating is equal to one. She pays the workers $6.00 per hour.
a. What is the allowance factor for the operation?
b. What is the labor standard (in minutes) per dress?
c. What is the labor cost per dress?
d. What is the labor cost for the entire order of 600 dresses?
Q7: A method of randomly observing work over
Q9: Decentralizing value chain activities lessens the control
Q30: What is the externalised cost of electricity
Q40: An administrator in a comprehensive hospital
Q62: Many products that appear to be only
Q65: Service design must be addressed from two
Q65: A manufacturer inspected 40 circuit boards and
Q66: Using Table 1, for the X-chart, what
Q70: Using Table 1, for the R-chart, what
Q105: Discuss the three basic quality control practices