Consider the following assembly line information for manufacturing the latest cell phone. The firm wants to produce 80 cell phones per hour.
a.What is the required cycle time?
b.Balance the assembly line using your choice of balancing heuristic, with the goal of minimizing the number of workstations needed? (Specify the task(s) assigned to each workstation.)
c.What is the efficiency of your assembly line?
d.Is this a good assembly line balancing solution? Explain.What do you recommend?
Method of Substitution
A technique used to solve systems of equations by solving one equation for one variable and substituting that expression into the other equation.
System of Equations
A set of equations with the same variables, which are solved together to find a common solution for those variables.
Method of Elimination
A technique used to solve systems of equations by eliminating one of the variables.
System of Equations
A set of equations with the same variables, which are solved together to find a common solution.
Q16: Ensuring that hotel staff at the front
Q33: A company makes traffic signals for downtown
Q39: Safety stock inventory is an additional amount
Q41: A local company makes athletic clothing and
Q48: Prototype testing is an important step in
Q52: A pull system<br>A)requires high levels of finished
Q56: Interlinking is the quantitative modeling of cause-and-effect
Q65: Contrast outsourcing with vertical integration.Also, contrast backward
Q68: Assembly line balancing problems involving many distinct
Q71: According to the National Research Council, companies