Consider the Following Assembly Line Information for Manufacturing the Latest

question 55

Essay

Consider the following assembly line information for manufacturing the latest cell phone. Consider the following assembly line information for manufacturing the latest cell phone.   The firm wants to produce 80 cell phones per hour.  a.What is the required cycle time? b.Balance the assembly line using your choice of balancing heuristic, with the goal of minimizing the number of workstations needed? (Specify the task(s) assigned to each workstation.) c.What is the efficiency of your assembly line? d.Is this a good assembly line balancing solution? Explain.What do you recommend? The firm wants to produce 80 cell phones per hour.
a.What is the required cycle time?
b.Balance the assembly line using your choice of balancing heuristic, with the goal of minimizing the number of workstations needed? (Specify the task(s) assigned to each workstation.)
c.What is the efficiency of your assembly line?
d.Is this a good assembly line balancing solution? Explain.What do you recommend?


Definitions:

Method of Substitution

A technique used to solve systems of equations by solving one equation for one variable and substituting that expression into the other equation.

System of Equations

A set of equations with the same variables, which are solved together to find a common solution for those variables.

Method of Elimination

A technique used to solve systems of equations by eliminating one of the variables.

System of Equations

A set of equations with the same variables, which are solved together to find a common solution.

Related Questions