A project consists of four consecutive tasks that have average duration and worst-case duration estimates (in days) as shown in the table.Use Newbold's model to determine the aggregated one sigma buffer for this project.  Activity  Average  Worst-Case A1020B1525 C 2030D2535\begin{array} { | l | l | l | } \hline \text { Activity } & \text { Average } & \text { Worst-Case } \\\hline A & 10 & 20 \\\hline B & 15 & 25 \\\hline \text { C } & 20 & 30 \\\hline D & 25 & 35 \\\hline\end{array}


Definitions:

Linear

Describing something that is arranged in or extends along a straight or nearly straight line.

Nonlinear

Not occurring in a straight line or sequential order, often referring to processes or relationships that do not have a direct or proportional correlation.

Structured Slides

Presentation slides that follow the same design templates throughout and give all the slides in a presentation the same general look; they emphasize textual information in bullet-point form.

Summarize Key Ideas

The process of distilling the most important information or concepts from a larger body of work or discussion.

Related Questions