Bombardeer, an auto manufacturer, incurred the following costs last month (in thousands of dollars) .
Use the information below to answer the following question(s) . Bombardeer, an auto manufacturer, incurred the following costs last month (in thousands of dollars) .    -The total manufacturing overhead costs for Bombardeer are A)  $945. B)  $1,095. C)  $815. D)  $525.
-The total manufacturing overhead costs for Bombardeer are


Definitions:

Event Task

A specific action or series of actions triggered by an event within a programmable system, such as a PLC or computer application.

Continuous Task

A task in control systems that runs repeatedly without interruption, typically used in monitoring or controlling processes.

ControlLogix Controllers

A range of industrial programmable logic controllers (PLCs) developed by Allen-Bradley, designed for applications requiring high-performance control and scalability.

RSLogix 5000

A software programming package used for industrial automation and control, specifically designed for programming Allen-Bradley Logix5000 family of controllers.