ABC Products produces three products (A, B and C) on three machines. Machines 1 and 2 are available for 40 hours a week and Machine 3 is available for 60 hours a week. Profit contribution and standard production time in hours are given in the following table:
Only one operator per machine is required on Machines #1 and #2. Two operators are required for Machine #3. Therefore, two hours of labor must be scheduled for each hour of Machine #3's time. To restate this requirement, two operators must be scheduled for each hour of Machine #3's operation, as well as one operator for each hour of Machine #1's operation and one operator for each hour of Machine #2's operation. A total of 110 labor hours is available for assignment to the three machines during the coming week. Other production requirements are that Product A cannot account for more than 40% of the units produced and that Product C must account for at least 25% of the units produced.
a. Develop the constraint for the capacity limit of Machine #1.
b. Develop the constraint for the capacity limit of Machine #3.
c. Develop the constraint for the labor capacity limit.
d. Develop the constraint for limiting Product A to no more than 40% of the units produced.
e. Develop the constraint that ensures Product C accounts for at least 25% of the units produced.
Q20: Which of the following is not a
Q24: The House of Quality shows the interrelationships
Q32: A local bank has two drive-thru teller
Q34: The reason that many Japanese firms captured
Q36: Contrast wait cost with server cost. Which
Q37: Which category of the Malcolm Baldrige National
Q42: Risk is a form of uncertainty associated
Q47: The learning curve does not apply to
Q64: In an automobile, which of the following
Q72: Low scalability was one of the reasons