Jim Royo,manager of Billings Building Supply (BBS) ,wants to develop a model to forecast BBS's monthly sales (in $1,000's) . He selects the dollar value of residential building permits (in $10,000) as the predictor variable. An analysis of the data yielded the following tables.  Jim Royo,manager of Billings Building Supply (BBS) ,wants to develop a model to forecast BBS's monthly sales (in $1,000's) . He selects the dollar value of residential building permits (in $10,000) as the predictor variable. An analysis of the data yielded the following tables.      Using  \alpha  = 0.05 the critical value of the Durbin-Watson statistic,d<sub>L</sub>,<sub> </sub>is _________. A)  1.24 B)  1.22 C)  1.13 D)  1.15 E)  1.85  Jim Royo,manager of Billings Building Supply (BBS) ,wants to develop a model to forecast BBS's monthly sales (in $1,000's) . He selects the dollar value of residential building permits (in $10,000) as the predictor variable. An analysis of the data yielded the following tables.      Using  \alpha  = 0.05 the critical value of the Durbin-Watson statistic,d<sub>L</sub>,<sub> </sub>is _________. A)  1.24 B)  1.22 C)  1.13 D)  1.15 E)  1.85
Using α\alpha = 0.05 the critical value of the Durbin-Watson statistic,dL, is _________.


Definitions:

Probability

A measure of the likelihood of a certain event or outcome, expressed as a number between 0 and 1.

PERT Network

A project management tool used to schedule, organize, and coordinate tasks within a project.

Expected Time

In project management, the average time estimated for the completion of a task or project, considering the most likely, optimistic, and pessimistic scenarios.

CPM Networks

Critical Path Method (CPM) networks are project management tools that map tasks in a project, identifying the longest sequence of dependent tasks (critical path) to determine the shortest project duration.