Which of the Following Statement(s)is/are Correct? I

question 144

Multiple Choice

Which of the following statement(s) is/are correct? I.A predetermined overhead rate is used to assign estimated overhead costs to work in process inventory.
II) The predetermined overhead rate is calculated by dividing estimated overhead cost by the estimated volume or level of activity.
III) The most common means of allocating overhead costs is to calculate a predetermined overhead rate at the end of the period.


Definitions:

Future Value

The value of an investment at a specific future date, including interest or dividends.

Interest Rate

The charge, delineated as a percentage of the initial amount, that a lender requires from a borrower for the utilization of assets.

One-sample Chi-square

A statistical test used to determine if a sample data matches a population with a specific distribution.

Goodness-of-fit Test

A statistical test used to determine how well observed data match the expected distribution or model.