Consider a single-line, single-server waiting line system. Suppose that there is only physical space for 2 units in the system (one in line and one being served). The arrival rate λ is 80 people per hour. The manager, Johnny Three Toes, has the choice among workers of different speeds to be the server. He wants to save money by hiring the slowest server that will result in an average number of units in the system (L) equal to 2.
a) Using Johnny Three Toes' strategy, what will the server's service rate per hour () need to be?
b) What is the probability of having 3 or more units in the system?
c) What is wrong with Johnny Three Toes' strategy?
No Rain
A meteorological condition indicating the absence of precipitation in a specific area over a given time period.
North American Cars
Vehicles that are manufactured or assembled by companies based in North America, often referring to cars produced in the United States, Canada, and Mexico.
Origin
A fixed point from which coordinates are measured, often used as a point of reference in mathematics, physics, and geography.
Driver
An individual or factor that has a significant impact on the outcome or behavior of a process or system.
Q5: Johnny Now,Inc.produces two different models of outhouses.Demand
Q15: Insourcing incurs a fixed cost of $1000
Q22: On Tuesday George produced 100 units in
Q28: Which activity appears to be most frequently
Q30: What are long-term decisions that set the
Q36: Suppose that you have created control charts
Q62: The old concept of quality involved _
Q69: What type of warehouse is used for
Q83: What measures the central tendency of a
Q122: Which of the following is not considered