Examlex

Solved

If Using Critical Ratio (CR) as the Scheduling Rule, the Job

question 61

True/False

If using critical ratio (CR) as the scheduling rule, the job with the smallest ratio of time remaining until due date to the processing time remaining has the lowest priority.


Definitions:

Semi-Permanent

A state or condition that is intended to last for a long time but not forever, often applied to structures or installations.

Schematic

A simplified representation of a system or circuit that uses symbols and lines to illustrate structure or function without showing actual layout.

Thread Representation

A standardized way of depicting the thread on fasteners or tapped holes in technical drawings, indicating form, pitch, and diameter.

Set Screws

Fasteners designed to pass through a threaded hole in one object to tighten against another, securing them together without protruding from the surface.

Related Questions