question 30

Multiple Choice

Cox Engineering performs cement core tests in its laboratory. The following standards have been set for each core test performed:  standard Hours or Quantitystandard price or Rate  Direct materials 3.0 pounds £0.75 per pound  Direct labour 0.4 hours £12.00 per hour  Variable manufacturing overhead 0.4 hours £9.00 per hour \begin{array}{lcc}&\text { standard Hours or Quantity} &\text {standard price or Rate }\\\text { Direct materials } & 3.0 \text { pounds } & £ 0.75 \text { per pound } \\\text { Direct labour } & 0.4 \text { hours } & £ 12.00 \text { per hour } \\\text { Variable manufacturing overhead } &0.4 \text { hours } & £ 9.00 \text { per hour }\end{array}

During March, the laboratory performed 2,000 core tests. On March 1 no direct materials (sand) were on hand. Variable manufacturing overhead is assigned to core tests on the basis of direct labour hours. The following events occurred during March:
8,600 pounds of sand were purchased at a cost of £7,310.
7,200 pounds of sand were used for core tests.
840 actual direct labour hours were worked at a cost of £8,610.
Actual variable manufacturing overhead incurred was £3,200.
-The labour rate variance for March is


Definitions:

Semantic Codes

In psychology and cognitive science, it refers to the process of encoding information into memory, focusing on the meaning of the information.

Structural Encoding

Structural encoding is the process of encoding information according to the structure of objects, focusing on the physical features rather than the meaning.

Phonemic Encoding

The process by which sounds are translated into mental symbols for storage in memory.

Semantic Encoding

The process of encoding sensory information into memory, attaching meaning and significance to it.

Related Questions