Examlex
Solve this linear programming mixture problem: Kim and Lynn produce pottery vases and bowls. A vase requires 25 oz of clay and 5 oz of glaze. A bowl requires 20 oz of clay and 10 oz of glaze. There are 500 oz of clay available and 160 oz of glaze available. The profit on one vase is $5 and the profit on one bowl is $3. How should Kim and Lynn schedule production to optimize profit?
Runoff
The flow of water that occurs when excess stormwater, meltwater, or other sources flows over the Earth's surface, often leading to erosion and transporting sediments.
Floodplain
Land that is level or almost level, located next to a river or stream, which undergoes infrequent or regular floods.
Meander
A winding curve or bend in a river, which occurs as the river erodes the landscape in sinuous patterns.
Flood
The result of water overfilling a channel and spilling out onto the floodplain or other adjacent land.
Q1: Suppose the regression line for a scatterplot
Q11: For which of the two situations below
Q20: Find the chromatic number of the graph
Q29: Given below is the sketch of the
Q36: Suppose a college campus decides to install
Q42: Which path listed forms a Hamiltonian circuit
Q64: Write the resource constraints for this situation:
Q80: Write a profit formula for this mixture
Q82: A national poll asked 1581 adults whether
Q86: Find the first quartile for the number