Examlex
An oil company produces oil at two wells. Well 1 can produce up to 150,000 barrels per day, and Well 2 can produce up to 200,000 barrels per day. It is possible to ship oil directly from the wells to customers in Los Angeles and New York. Alternatively, the company could transport oil to the ports of Mobile and Galveston and then ship it by tanker to New York or Los Angeles. Los Angeles requires 160,000 barrels per day, and New York requires 140,000 barrels per day. The costs (in dollars) of shipping 1000 barrels between various locations are shown below:
-(A) Assume that before being shipped to Los Angeles or New York, all oil produced at the wells must be refined at either Mobile or Galveston. To refine 10000 barrels of oil costs $12 at Mobile and $10 at Galveston. Assuming that both Mobile and Galveston have infinite refinery capacity, determine how to minimize the daily cost of transporting and refining the oil requirements of Los Angeles and New York.
(B) Rework (A) under the assumption that Galveston has a refinery capacity of 150,000 barrels per day, and Mobile has a refinery capacity of 180,000 barrels per day.
Junk Bonds
Junk bonds are high-yield bonds that carry a higher risk of default compared to investment-grade bonds, offering higher interest rates to compensate for the increased risk.
Interest Rate Risk
The potential for investment losses due to fluctuations in the interest rates, affecting the value of interest-bearing assets like bonds.
Variable Rate Coupons
Bonds or other loans that have interest payments adjusted at periodic intervals based on a reference interest rate.
Q6: The term nonnegativity refers to the condition
Q13: are important because they help to ensure
Q22: Suppose Amanda will stop investing in the
Q25: In investment models,a useful approach for generating
Q27: When the error variance is nonconstant,it is
Q46: In an additive seasonal model,we add an
Q61: Describe the use of null values in
Q70: One important special use of bounded distributions
Q74: The "building blocks" of all spreadsheet simulation
Q82: Workforce scheduling problems are often integer programming