The lowest notch shown on this figure is 9 meters wide and 5 meters high from its base.The river has a velocity of 0.7 meters per second when it fills the notch.Based on the accompanying graph,what is the probability each year that the notch will be filled to the top? The lowest notch shown on this figure is 9 meters wide and 5 meters high from its base.The river has a velocity of 0.7 meters per second when it fills the notch.Based on the accompanying graph,what is the probability each year that the notch will be filled to the top?     A) 80 to 95% B) 60 to 70% C) 40 to 45% D) less than 40% E) none of these The lowest notch shown on this figure is 9 meters wide and 5 meters high from its base.The river has a velocity of 0.7 meters per second when it fills the notch.Based on the accompanying graph,what is the probability each year that the notch will be filled to the top?     A) 80 to 95% B) 60 to 70% C) 40 to 45% D) less than 40% E) none of these


Definitions:

Economic Loss

A situation where total costs exceed total revenues, resulting in a negative profit for a business or economy.

Short Run

A period of time during which at least one of a firm's inputs is fixed, affecting the firm's capacity to adjust to demand changes.

Short Run

The short run is a period in economics where at least one factor of production is fixed, limiting the adjustments a firm can make to its inputs.

Average Variable Cost

The total variable cost divided by the quantity of output produced; it shows the cost of producing one more unit of output.