An Assembly Line Has to Perform 10 Work Elements,whose Time

question 92

Multiple Choice

An assembly line has to perform 10 work elements,whose time requirements follow below.An operations analyst has found a solution using some heuristics.The solution follows below. Solution
An assembly line has to perform 10 work elements,whose time requirements follow below.An operations analyst has found a solution using some heuristics.The solution follows below. Solution   If the cycle time of the line is 90 seconds,what is the efficiency of the assembly line? A) less than 85% B) greater than 85% but less than 90% C) greater than 90% but less than 95% D) greater than 95% If the cycle time of the line is 90 seconds,what is the efficiency of the assembly line?


Definitions:

Ozone Depletion Potential (ODP)

Rating of atmospheric gases according to their ability to damage the ozone layer. For instance, CFCs would be rated at a higher ODP than HCFCs.

Refrigerants

Substances used in heating, ventilation, air conditioning, and refrigeration (HVAC/R) systems, responsible for absorbing and removing heat to facilitate cooling or refrigeration.

Cooling Capacity

The amount of heat energy that a cooling system (such as an air conditioner or refrigerator) can remove from a specific area within a certain time period.

Refrigerated Van

A refrigerated van is a vehicle designed with insulation and a cooling system to transport perishable goods at controlled temperatures.

Related Questions