Examlex
Billy's Blues sells 3 types of T-shirts: Astro, Bling, and Curious. Manufacturing Astros requires 2 minutes of machine time and 20 minutes of labor, and costs $10. Brand Bling requires 2.5 minutes of machine time and 30 minutes of labor, and costs $14 to produce. Brand Curious requires 3 minutes of machine time and 45 minutes of labor, and costs $18 to produce. There are 300 machining hours available per week, 3750 labor hours, and he has a budget of $3000. Brand Astro sells for $15, Brand Bling for $18, and Brand Curious for $25.
The LP formulation that maximizes week profit shown below.
MAX 15A +18B + 25 C
s.t.
2A + 2.5B + 3C ? 300
20A + 30B + 45C ? 3750
10A + 14B + 18C ? 3000
The solution from QM for Windows is show below.
-If Billy could acquire more of any resource, which would it be?
Material Resources
Physical items such as equipment, buildings, and raw materials that are used in the operation of a business or project.
Trademarks
Legal protections for logos, names, and other unique marks that distinguish goods or services and protect them from being used without permission.
Raw Materials
The basic, unprocessed resources required for manufacturing goods or providing services, such as metals, wood, oil, or agricultural products.
Outsourcing
Is the process of hiring outside firms to handle basic HRM functions, presumably more efficiently than the organization could.
Q10: In an integer program, if building one
Q12: If a maximization linear programming problem consists
Q12: The committee would like to assign
Q13: If one location for a warehouse can
Q16: _ is the analysis of the effect
Q43: In a balanced transportation model, supply equals
Q46: A small popular restaurant at an interstate
Q59: In a preemptive priority system, the lowest-priority
Q60: Consider the following integer linear programming problem:<br>Max
Q77: What is the sensitivity range of the