Examlex

Solved

Manufacturing Operation Time in a Time Study Conducted at a Manufacturing Plant, the Manufacturing

question 105

Essay

Manufacturing Operation Time
In a time study conducted at a manufacturing plant, the length of time to complete a specified operation is measured for each one of n = 40 workers. The mean and standard deviation are found to be 15.2 and 1.40, respectively.
-Refer to the Manufacturing Operation Time statement. Describe the sample data using Tchebysheff's Theorem.


Definitions:

Wells Serviced

The number of oil, gas, or water wells that have undergone maintenance, repair, or evaluation activities within a given period.

Planning Budget

A budget prepared for a particular level of activity, used to gauge financial performance by comparing actual results with budgeted amounts.

Passengers

Individuals who travel in a vehicle but do not operate it, often used in the context of public or private transport services.

Activity Variance

The difference between the planned budget allocation for a particular activity and the actual expenditure incurred for that activity.

Related Questions