Examlex

Solved

A Company Is Trying to Balance Production Between 3 Workstations

question 253

Essay

A company is trying to balance production between 3 workstations on an assembly line. Currently there are 5 tasks that need to be performed. These tasks, ABCDE, have required times of 2 minutes, 4 minutes, 1 minutes, 3 minutes, and 10 minutes, respectively. The assembly line needs to produce 40 units per day to meet demand and can work for up to 8 hours each day.
(a) What is the required cycle time?
(b) What is the theoretical minimum # of workstations?
(c) Assign the tasks according to the shortest task time heuristic.


Definitions:

Afterpotential

Afterpotential refers to the changes in membrane potential that follow an action potential in a neuron, often leading to either hyperpolarization or depolarization.

Threshold

The minimum level of stimulation required to trigger a neural impulse or a response in other signal-transmitting systems.

Voltage-Gated Channel

A type of ion channel that opens or closes in response to changes in membrane potential, critical for nerve impulse transmission.

Chemical Synapse

A junction between two nerve cells, where neurotransmitters are used to relay signals.

Related Questions