A work cell is required to make 140 computerized diagnostic assemblies (for installation into hybrid automobiles)each day.The cell currently works an eight hour shift,of which seven hours is available for productive work.These assemblies require five operations.Standard times for these operations are: Operation A,3.0 minutes,B,1.8 minutes,C,2.4 minutes,D,2.5 minutes,and E,1.4 minutes.What is takt time for this cell? How many workers will be needed to achieve this schedule? Use the grid below to construct a work balance chart for this cell.
Ratio Scales
Measurement scales that have a true zero point and allow for comparisons of absolute magnitude; examples include height, weight, and duration.
Absolute Zero
The point at which there is a complete absence of heat, theoretically the lowest possible temperature, -273.15°C or 0K.
Quantitative Distinctions
Differences or characteristics that can be measured and expressed numerically, often used in research to classify or analyze data.
Measurement Scale
A system for assigning numbers to objects or events according to a set of rules, illustrating quantities or qualities.
Q2: An advantage of work sampling is that
Q3: Acceptance sampling<br>A)may involve inspectors taking random samples
Q21: An assembly line with 11 tasks is
Q68: Which of the following products is not
Q75: If the schedule calls for the production
Q81: _ is a Japanese term to describe
Q84: The owner of a millwork shop is
Q90: A product sells for $5,and has unit
Q133: Which of the following is used by
Q182: When a worker obtains clear and timely