Examlex

Solved

A Company Is Trying to Balance Production Between 3 Workstations

question 150

Essay

A company is trying to balance production between 3 workstations on an assembly line. Currently there are 5 tasks that need to be performed. These tasks, ABCDE, have required times of 2 minutes, 4 minutes, 1 minutes, 3 minutes, and 10 minutes respectively. The assembly line needs to produce 40 units per day to meet demand and can work for up to 8 hours each day.
A. What is the required cycle time?
B. What is the theoretical minimum # of workstations?
C. Assign the tasks according to shortest task time.
D. Is there a better way to divide the work than in Part C?


Definitions:

Compressor Inlet Restriction

A condition where the airflow into a compressor is impeded, leading to reduced performance and potential damage.

Unloader Circuit

A hydraulic or pneumatic circuit component designed to relieve pressure or unload the pump of its load when reaching a preset value.

Air Dryer Purge Valve

A component within an air dryer system that releases air and moisture from the system to prevent water build-up and maintain effective operation.

OOS Criteria

Stands for "Out-of-Service Criteria," which are standards used to determine when a vehicle or driver is not deemed safe for operation.

Related Questions