A company is trying to balance production between 3 workstations on an assembly line. Currently there are 5 tasks that need to be performed. These tasks, ABCDE, have required times of 2 minutes, 4 minutes, 1 minutes, 3 minutes, and 10 minutes respectively. The assembly line needs to produce 40 units per day to meet demand and can work for up to 8 hours each day.
A. What is the required cycle time?
B. What is the theoretical minimum # of workstations?
C. Assign the tasks according to shortest task time.
D. Is there a better way to divide the work than in Part C?
Compressor Inlet Restriction
A condition where the airflow into a compressor is impeded, leading to reduced performance and potential damage.
Unloader Circuit
A hydraulic or pneumatic circuit component designed to relieve pressure or unload the pump of its load when reaching a preset value.
Air Dryer Purge Valve
A component within an air dryer system that releases air and moisture from the system to prevent water build-up and maintain effective operation.
OOS Criteria
Stands for "Out-of-Service Criteria," which are standards used to determine when a vehicle or driver is not deemed safe for operation.
Q3: Acceptance sampling<br>A)may involve inspectors taking random samples
Q25: Which of the following is not an
Q25: _ avoids placing materials or supplies in
Q29: Which layout type assumes an adequate volume
Q55: How is the statistical tool of adequate
Q90: The project remains in one place and
Q117: A(n)_ uses symbols to analyze the movement
Q144: A product requires 24 separate tasks,and the
Q158: Labour standards based on historical experience are
Q166: What are the advantages and the disadvantages