The 5Ss-sort/segregate, simplify/straighten, shine/sweep, standardize, and sustain/self-discipline-are important to lean production because they act as a means to reduce waste.
PERT Analysis
Program Evaluation and Review Technique; a project management tool used to plan, schedule, and control complex tasks.
Critical Path
The sequence of stages determining the minimum time needed to complete a project, often identifying bottlenecks or delays.
Noncritical Activity
a task in a project that does not directly impact the project's final completion date due to existing time allowances or float.
Q4: A small private university normally charges the
Q19: Identify some of the signals that kanban
Q40: JIT brings about competitive advantage by faster
Q41: _ maintains a constant output rate,or work
Q53: TPM (total productive maintenance)is an application of
Q58: What does TPS stand for?
Q70: If an assignment problem consists of 5
Q71: A manufacturer of industrial seafood processing equipment
Q85: Which of the following is NOT needed
Q92: In MRP,a "bucket" refers to a fixed