You have been asked to balance a flow shop assembly operation to achieve an output rate of 80 units per eight-hour day.Task times and precedence relationships are shown in the table below.
You have been asked to balance a flow shop assembly operation to achieve an output rate of 80 units per eight-hour day.Task times and precedence relationships are shown in the table below.    a.Draw the precedence diagram. b.Determine the desired cycle time. c.Determine the theoretical minimum number of stations needed. d.Balance this line using the most following tasks heuristic. e.What is the efficiency of the line obtained in part d? a.Draw the precedence diagram.
b.Determine the desired cycle time.
c.Determine the theoretical minimum number of stations needed.
d.Balance this line using the most following tasks heuristic.
e.What is the efficiency of the line obtained in part d?


Definitions:

Water Molds

Heterotrophic protists (stramenopiles) that grow as a mesh of nutrient-absorbing filaments.

Irish Famine

A period of mass starvation, disease, and emigration in Ireland between 1845 and 1852 that was caused by potato blight.

Potato Crop

A cultivated plant of the species Solanum tuberosum, grown for its edible tubers.

Slime Molds

Group of eukaryotic organisms that are not fungi, plants, or animals but share common characteristics with these groups during parts of their life cycle.

Related Questions