Develop a solution for the following line balancing problem,allowing a cycle time of 5 minutes.
a.Draw the precedence diagram for the set of tasks.
b.Calculate the theoretical minimum number of workstations.
c.Balance this line using the longest task time heuristic.
d.What tasks are assigned to which stations?
e.Does the solution have the minimum number of stations? Explain.
f.How much idle time is there,summed over all workstations?
g.What is the efficiency of this line?
Continental Crust
The thick part of the Earth's crust that forms the continents, characterized by a composition that is different from oceanic crust.
Rocks
Solid mineral material forming part of the surface of the earth and other similar planets, exposed on the surface or underlying the soil or oceans.
Wooden Pillar
A structural element made of wood, serving as a support in buildings, bridges, or other structures.
Stone Weight
A unit of weight commonly used in some countries, equivalent to 14 pounds or about 6.35 kilograms.
Q16: Swift movement through the facility is typical
Q18: A grocery chain is deciding on where
Q20: A craftsman builds two kinds of birdhouses,one
Q22: A waiting-line system that meets the assumptions
Q28: Political/legal change and economic change are both
Q53: Why is equipment utilization in process-focused service
Q54: Two methods of solving linear programming problems
Q56: Suppose that a constraint for assembly time
Q70: In a product-oriented layout,the process of deciding
Q110: A restaurant kitchen contains a wall poster