A Production Line Is to Be Designed for a Job

question 33

Multiple Choice

A production line is to be designed for a job with four tasks. The task times are 2.4 minutes, 1.4 minutes, 0.9 minutes, and 1.7 minutes. After line balancing, the longest possible assigned task time is ________ and the shortest possible assigned task time is ________ minutes.