A Methods and Measurements Analyst needs to develop a time standard for a certain task.The task involves use of ruler,square,and portable electric saw to mark and cut the "notch" in a rafter (a standard carpentry task of home construction).In a preliminary study,he observed one of his workers perform this task five times.The observations were made in an air-conditioned,well-lighted training facility,at ground level,with all tools and equipment clean and readily available.
a.What is the actual average time for this task?
b.What is the normal time for this task if the employee worked at a 20% faster pace than is typical for adequately trained workers?
c.What is standard time for this task if allowances are 8% constant and 6% variable?
d.If the analyst then thought more carefully about his experiment,and decided that the variable allowances needed to be increased to match the real (outside,unair-conditioned)work environment,and that the proper variable allowance was not 6% but 12%,what is the revised standard time?
Q4: Why is a closed-loop design so important
Q4: Properly set labour standards represent the amount
Q5: Receptors of attractive cues in axon guidance
Q9: Service level is<br>A)the chance of stocking out.<br>B)the
Q12: "Designed to show economy of motion by
Q34: Many neurodevelopmental disorders are associated with alternations
Q39: Demand for dishwasher water pumps is 8
Q83: Which of the following is an aspect
Q121: The fastest growing mode of shipping is
Q137: Assume two inventory problems with identical demand,holding